Animated Solution for Mathematics - Sequence and Series: A software company sets up number of computer systems to finish an assignment in 17 days. If 4 computer systems crashed on the start of the second day, 4 more computer systems crashed on the start of the third day and so on, then it took 8 more days to finish the assignment. The value of is equal to:

Select Answer:

Visualized Solution

Defining Total Work

  • Let the initial number of computer systems be .
  • Planned duration to finish the assignment = days.
  • Total Work = (Number of systems) (Number of days) = system-days.

Analyzing the System Crashes

  • Day 1: All systems work.
  • Day 2: systems crash systems work.
  • Day 3: more crash systems work.
  • This constant decrease forms an Arithmetic Progression (A.P.).

Calculating Total Actual Days

  • Original planned time = days.
  • Extra time taken due to crashes = days.
  • Total actual time = days.
  • This means our A.P. has terms.

Applying the Sum of A.P. Formula

  • Sum of terms of an A.P.:
  • First term () =
  • Common difference () =
  • Number of terms () =
  • Actual Work =

Equating the Total Work

  • The total amount of work to finish the assignment remains constant.
  • Planned Work = Actual Work

Simplifying the Equation

  • Equation:
  • Divide the terms inside the bracket by :

Expanding and Rearranging

  • Expand the right side:
  • Rearrange the terms to group :

Final Calculation

  • The initial number of computer systems was .

The Sigma Insight: Arithmetic Progression (A.P.)

Solution Diagram

Analyzing the Setup

Imagine you are the project manager at a high-stakes software firm. You have a massive assignment, a deadline, and a team of computer systems ready to crunch the data. You have calculated that with systems, you can finish the job in exactly 17 days.
In physics and mathematics, when you encounter a problem involving work, the most powerful tool in your arsenal is the concept of Invariance. Think of the 'Total Work' as a fixed volume of water in a tank. Whether you drain it quickly with a wide pipe or slowly with a narrow one, the total amount of water remains the same.
In our scenario, the 'Total Work' is the product of the number of systems and the number of days. We define this as:
This is our North Star. No matter how many systems crash, the total effort required to complete the assignment is fixed at system-days. This is the bedrock upon which we will build our solution.

The Pattern of Chaos

Now, let us look at the chaos. On the first day, all systems are humming along. But at the start of the second day, disaster strikes: 4 systems crash. Now we have . On the third day, 4 more crash, leaving us with .
Do you see the pattern? It is not random; it is a sequence. Specifically, it is an Arithmetic Progression (A.P.). In an A.P., we have a first term, , and a common difference, .
Here, our first term is . Our common difference is (because the number of systems is decreasing by 4 each day).

The Time Dilation

We know the original plan was 17 days. But the problem tells us it took 8 more days to finish. If the work took 8 more days, the total duration is simply:
Our A.P. does not stop at 17; it continues for 25 days. We are now looking for the sum of the first 25 terms of this sequence.

The Mathematical Bridge

We have the total work () and we have the actual work done (the sum of the A.P. over 25 days). Since the work is invariant, we can equate them.
Recall the sum formula for an A.P.:
Substituting our known values (, , ):
Now, we set the Planned Work equal to the Actual Work:

The Algebraic Resolution

This is the moment where the complexity dissolves. Let us simplify the expression inside the brackets. Since , we have:
Notice the beauty of the numbers here. We can factor out a 2 from the bracket, which perfectly cancels the 2 in the denominator:
Now, it is just simple algebra. Expand the right side:
Rearrange to isolate :

Conclusion

The Elegance of Logic
And there we have it. The initial number of systems was 150.
What makes this problem so satisfying is not the final number, but the journey. We took a chaotic real-world scenario—systems crashing, deadlines slipping—and we tamed it with the rigid, beautiful structure of an Arithmetic Progression.
Remember, in JEE Advanced, the math is rarely just about calculation. It is about modeling. It is about finding the invariant truth in a sea of variables. You have just mastered that skill. Keep that confidence, and carry it into your next challenge!

Similar Questions

JEE Main 2020 (7 Jan Evening)
LEVELBoard

If the sum of the first 40 terms of the series, is , then is equal to:

(A)
20
(B)
25
(C)
10
(D)
5
JEE Main 2011
LEVELJEE Main

A man saves Rs in each of the first three months of his service. In each of the subsequent months his saving increases by Rs more than the saving of immediately previous month. His total saving from the start of service will be Rs after

(A)
19 months
(B)
20 months
(C)
21 months
(D)
18 months
JEE Main 2020 (7 January Shift 2)
LEVELBoard

If the sum of the first 40 terms of the series, is , then m is equal to :

(A)
10
(B)
25
(C)
5
(D)
20
JEE Main 2018 (Paper 1)
LEVELJEE Main

Let be in A.P. such that and . If , then is equal to :

(A)
33
(B)
66
(C)
68
(D)
34
JEE Main 2022 (27 July Shift 1)
LEVELJEE Main

Suppose be an arithmetic progression of natural numbers. If the ratio of the sum of the first five terms to the sum of first nine terms of the progression is and , then the sum of the first ten terms of the progression is equal to -

(A)
290
(B)
380
(C)
460
(D)
510
JEE Main 2025 (January)
LEVELJEE Main

Let be the rth term of an A.P. If for some m, and , then is equal to Note: is given condition in Hindi version.

(A)
98
(B)
126
(C)
142
(D)
112
JEE Main 2010
LEVELJEE Main

A person is to count currency notes. Let denote the number of notes he counts in the th minute. If and are in an AP with common difference , then the time taken by him to count all notes is

(A)
34 minutes
(B)
125 minutes
(C)
135 minutes
(D)
24 minutes
JEE Main 2019 (12 April)
LEVELJEE Main

If are in A.P. such that , then the sum of the first 15 terms of this A.P. is :

(A)
200
(B)
280
(C)
120
(D)
150
JEE Main 2023 (31 January Shift 1)
LEVELBoard

Let be in A.P. If and , then is equal to

JEE Main 2021 (01 September Shift 2)
LEVELJEE Main

Let be an such that . If the sum of this is , then is equal to :

(A)
57
(B)
72
(C)
48
(D)
36